Quantcast
Jul 132017
 

Here is the latest roadwork list for the town of Orange.

One-inch Overlay With Tack (Tilcon):

Willard

Garden Road: Route 34

  • Northwood

Fernbrook

Midland Drive

Lower Hyland

Upper Sylvan Valley

Upper Hemlock Hill

Twin Acre

Lindy Street

Reclaim:

(Total dig do over)

Peck Lane: Pine Tree to Peck & Post’s rear driveway

Treat Lane: Old Tavern to Ridge

Herbert Street

Turkey Hill School

Mill and Pave: 

(scratch the surface – September)

Meetinghouse Hill

North Orange Center

Police Department

Highway Garage/Firehouse

Sorry, the comment form is closed at this time.